Rajkot's parts makers and the first export order
Rajkot's engineering units already work to drawings and tolerances. The first export order is won by putting that discipline on paper for a buyer who has never visited.
Key takeaways
- Rajkot's engineering units already work to drawings and tolerances, which export buyers value.
- A first export order needs paperwork as much as machining: registration, specifications, terms and documents.
- Agreeing the delivery terms and payment terms early avoids most first-order disputes.
- A simple checklist, prepared once, makes every later order easier.
On this page
Made to a drawing
Rajkot is known for engineering goods: castings, forgings, pumps, auto parts and machine tools. Much of it is made to a customer’s drawing, within a tolerance, and checked before dispatch.
That is exactly what an export buyer wants to hear. Making to specification is the skill buyers find hardest to replace. Rajkot already has it.
What changes with the first export order
Selling to a buyer across the country runs on trust built in person. Selling to a buyer abroad runs on paper. The buyer may never visit. Everything they rely on has to be written down.
The first-order checklist
Registration
An Importer Exporter Code (IEC) from the DGFT is the basic registration for exporting from India. Product and market requirements come on top and are checked for each case.
Specification and inspection
A written specification for each part: material, dimensions, tolerances, finish and packing. An inspection record at dispatch, so that a question three weeks later can be answered with a document, not a memory.
Delivery terms
The terms decide who pays for what, and where responsibility passes.
| Term | Seller arranges | Responsibility passes |
|---|---|---|
| FOB (Free on Board) | Goods cleared for export and loaded at the Indian port | When goods are on board at the port of shipment |
| CIF (Cost, Insurance and Freight) | The above, plus freight and insurance to the destination port | Risk passes on loading; costs paid to destination |
Delivery terms have exact definitions, so the version and the named port are written into the order.
Payment terms
A first order is usually secured with an advance, a part advance with the balance against documents, or a letter of credit. The terms are agreed before production starts, not after the goods are ready.
Documents
A commercial invoice, a packing list, and the documents the product and market require. The list is confirmed with the buyer and the freight forwarder for each shipment.
The machine shop is the hard part. The paperwork is learnable in a week.
Quick check: could a buyer abroad place an order with you today using only what is written down? If they would need to call to understand the specification, the terms or the lead time, write it down first.
Beyond the first order
The first order proves the unit can deliver. The second order is where the relationship starts. It comes from the same things: parts that match the specification, honest lead times, and one person who answers the buyer’s emails within a day.
FAQs
What registration is needed to export from India?
An Importer Exporter Code (IEC) from the DGFT is the basic registration. Product and market specific requirements are checked separately.
What do FOB and CIF mean?
They are delivery terms. Under FOB the seller's responsibility ends when goods are loaded at the port of shipment; under CIF the seller also pays freight and insurance to the destination port.
How is payment usually secured on a first order?
Common options are an advance payment, part advance with the balance against documents, or a letter of credit. The choice depends on the buyer and the order size.
Conclusion
Rajkot already has the hard part: the ability to make to a drawing. The first export order is won by writing everything else down, the specification, the terms and the documents, before the buyer asks.
